Relocations of 4 pipe FCU’s and installation of new Barrell pipework.

Pipe Freeze on riser branches to floors to allow for new commissioning sets to be installed

Adaptations to Primary ductwork to allow for supply air to new FCU’s

Adaptations to all Secondary air ductwork and installation of new 1200 x 300 linear grilles within a SAS ceiling grid

Adaptations for Mechanical small power

Installation of new Hager Lighting Control system, new ceiling 1200 x 300 LED luminaires

New Cleaners Sockets power via floor grommets, Installation of new external lighting with Decking

Within the reception area a bespoke KNX control system fully integrated for Audio, Lighting, ventilation and Touch screen desk mounted tablet

One Carey Lane

Refurbishment of 3rd and 5th floor Cat A, Toilets, Reception

Value -  £318,000 Traditional Build

Bias - MEP